An engineer working on a solar energy study

Energy study: the cheapest part of the project, and the most critical

Every mistake in the study is paid for over 25 years. That is why no Fotergeia project starts from an equipment catalogue, but from analysis of your actual consumption and simulation of expected production.

Free Technical Study Quick calculation Download PDF
Description

What a serious energy study includes

The energy study is the technical documentation of your investment. It answers four questions with numbers rather than estimates: how much energy you use and when, how much can be produced at that particular site, what share of production you will actually use and how well the result performs financially.

Without those four, any quotation is guesswork. The most common mistake in the market is sizing by eye or by roof area – an approach that ends either in undersized systems that do not cover consumption, or oversized ones that never pay back.

The study is also where the following is decided: self-consumption scheme: Net Billing, Zero Feed-In or off-grid system. That decision has a greater effect on the final result than the choice of panel brand.

Technical specifications

The seven stages of the study

01

Consumption analysis

Processing at least a year of bills, seasonality analysis, separation of daytime and evening consumption. For businesses, load recording with a power analyser where required.

02

Site recording

Measuring available surface, orientation and tilt, checking the type and condition of the roof, structural adequacy and mounting method.

03

Shading analysis

Recording the horizon and obstructions – buildings, trees, chimneys, air conditioning units – and estimating losses by hour and season. It determines the string layout.

04

Production simulation

Hourly simulation with meteorological data for the site, calculation of annual yield per kWp and monthly production distribution.

05

Self-consumption calculation

Matching production and consumption hour by hour, to arrive at the real utilisation rate – with and without a battery.

06

Equipment sizing

Selection of capacity, panel type, inverter and storage, single-line diagrams, cable cross-sections, protection devices and an earthing study.

07

Techno-economic assessment

Estimate of annual savings, payback period and return on investment, with scenarios for different energy prices and system sizes.

Advantages

Why the study is worth doing before the quotation

The right size

You avoid both undersizing and excessive initial cost.

Comparable quotations

With a documented study you can compare quotations on an equal basis, rather than on price per kWp.

Realistic expectations

You know from the start what savings to expect – and you are not surprised by the first bill.

Technical safety

Structural adequacy, correct cable cross-sections and protection devices are documented before the first panel goes up.

Funding application file

The study forms the basis for subsidy applications, bank lending or leasing.

Provision for expansion

We design so that a battery, heat pump or vehicle charger can be added later.

Process

What we need from you

The more complete the information, the more accurate the study. If something is missing, do not worry – we fill it in during the site survey.

Send us your details
Electricity bills
Ideally a full year, so that seasonality is captured.
Supply details
Supply number, agreed capacity, single-phase or three-phase connection.
Property address
For solar potential, a grid check and preliminary shading analysis.
Photographs or roof drawings
Type of covering, obstructions, position of the electrical panel.
Future loads
A heat pump, vehicle charger, pool, new machinery.

Frequently asked questions

Is the study free?

The initial technical study and quotation are provided free and without obligation. More extensive studies for complex industrial projects or for funding applications are priced separately and offset against the project if it proceeds.

How long does it take?

For residential projects, usually a few working days from the moment we have the data. For industrial projects with load recording, the time depends on the length of the measurement – typically one to two weeks.

I do not have old bills. Can you still do a study?

Yes. On new builds, or where there is no history, we work from a load schedule: we record the appliances and their usage and construct a consumption profile. It is the same method we use on off-grid systems.

Start with the study – free and without obligation

Send us your bills and a few photographs of the roof. You will receive a documented proposal with numbers you can check.

Request a Study 210 300 9124